Chapter 29


Fwd Mid Fuse Side Structure 29-18 to 29-20

With fellow builder Steve snapping at my heels having completed a set of wings, tanks etc. in the same time that I have got this far, we pushed on with getting closer to the great…


Fwd Mid Fuse Side Structure 29-18

Having spent the summer sorting out the RV3A its time to get building again. Time to attach the web stiffeners which is an easy riveting job with the squeezer. It would have been even easier…


Fwd Mid Fuse Side Structure 29-19

I have jumped forward as I need to do some priming of parts for the wing root fairings that I missed when I tried to do all the parts in one go – typical. 29-19…


Fwd Mid Fuse Side Structure 29-17

Finally after what has taken a lot longer than it should have (new job, new aircraft, lack of assistance) the fuselage sides are complete and I’m moving on to the Root Fairing Attachment Angles. Hopefully…



Fwd Mid Fuse Side Structure 29-10 to 29-14

Every now and then, just when you think you have this building malarkey mastered, a curve ball comes at you at the speed of sound. 29-10 to 29-12 involves preparing the side skins for attachment…


Fwd Mid Fuse Side Structure 29-09

The #30 holes are final drilled common to the side skin, centre section and upper drag fitting. The centre section side plate, skin and the upper and lower longeron assemblies are removed (there is a…


Fwd Mid Fuse Side Structure 29-08 to 29-09

Side skins fitted and upper and lower longerons secured with temporary 3/8th bolts to enable alignment of the cowing attachment hinges. Initially I struggled in to get the skin to align with the firewall and…


Fwd Mid Fuse Side Structure 29-06 to 29-07

Going back over the parts of the construction that I have skipped to get the priming done on a bulk basis. The engine attachment blocks must be attached to the upper and lower longerons with…