Fwd Mid Fuse Side Structure 29-10 to 29-14
Every now and then, just when you think you have this building malarkey mastered, a curve ball comes at you at the speed of sound. 29-10 to 29-12 involves preparing the side skins for attachment…
Every now and then, just when you think you have this building malarkey mastered, a curve ball comes at you at the speed of sound. 29-10 to 29-12 involves preparing the side skins for attachment…
The #30 holes are final drilled common to the side skin, centre section and upper drag fitting. The centre section side plate, skin and the upper and lower longeron assemblies are removed (there is a…
Side skins fitted and upper and lower longerons secured with temporary 3/8th bolts to enable alignment of the cowing attachment hinges. Initially I struggled in to get the skin to align with the firewall and…
Going back over the parts of the construction that I have skipped to get the priming done on a bulk basis. The engine attachment blocks must be attached to the upper and lower longerons with…
Happy New Year Van’s builders. Nothing new to add apart from a whole day of etching and priming. Dog likes the smell of etching fluid.