Horizontal Stabiliser – 0812 to 0813 finished
Inspector gave the go ahead for fitting the rear spar. An easy riveting job with blind rivets onto the in spar ribs and the used the squeezer to attach the skins to the spar. Some…
Read MoreInspector gave the go ahead for fitting the rear spar. An easy riveting job with blind rivets onto the in spar ribs and the used the squeezer to attach the skins to the spar. Some…
Read MoreSkins riveted on to stringers, forward spar and inspar ribs. Some awkward rivets in the leading edge. Waiting for inspection and then rear spar to be riveted in place.
Lots to do with the HS much of which involves deburring, match drilling and deburring. This is the first time that it has been difficult to follow the plans as you need to do a…