Fwd Mid Fuselage Side Structure 29-08 to 29-11
Still building, just lots of separating, trimming and deburring. The pile of metal grows on a daily basis. Lots of priming to be done before a concentrated burst of construction.
Still building, just lots of separating, trimming and deburring. The pile of metal grows on a daily basis. Lots of priming to be done before a concentrated burst of construction.
Go on a wiring course they said, you’ll learn loads and get a trip to Englandshire. So, the LAA Wiring Course was booked and travel arrangements made. I live 10 minutes from Aberdeen airport (pay…
Jumping forward again until I can get some priming done. I separated the Cowling Hinge Shims and then moved onto fabricating the cowling hinges. There are 2 lengths of piano hinge supplied with the fuselage…
I had jumped forward a couple of pages as installing the Control Column Assembly required a good run of patience. It involves bolting one side to the bearing bracket after inserting a set pattern of…