June 2019

Fwd Mid Fuse Side Structure 29-17

Finally after what has taken a lot longer than it should have (new job, new aircraft, lack of assistance) the fuselage sides are complete and I’m moving on to the Root Fairing Attachment Angles. Hopefully…