Fwd Fuselage Lower Structure

Fwd Fuselage Structure 28-04

The Muffler Sides are riveted to the floor panels after adding some gloup (Proseal) to keep oil sludge out of the cockpit. I back riveted the sides on which was successful but messy. Next the…


Fwd Fuselage Structure 28-02 to 28-04

Skin stiffeners and antenna doublers riveted to the Forward Bottom Skins. I had already enlarged the hole for the second comms antenna as I intend to fit a second box. In fact, having spoken to…


Fwd Fuselage Lower Structure 28-01

All parts prepped ready for construction of the Fwd Fuselage Lower Structure. I had already primed the floor panels but they needed to be dimpled. I am still undecided as to the finish on the…