Fwd Fuselage Structure 28-10 to 28-11
Finished riveting the Battery Box to the firewall. The Cover Panels are riveted to the Cover Brackets and ribs. Some of the rivets can be squeezed but there isn’t enough space at the most inboard…
Finished riveting the Battery Box to the firewall. The Cover Panels are riveted to the Cover Brackets and ribs. Some of the rivets can be squeezed but there isn’t enough space at the most inboard…
The Forward Center Section Bulkhead Assembly is now bolted and riveted to the Firewall assembly. The bolts are easy, the rivets not so. To rivet the Tunnel Sides to the assembly, I reversed the direction…
The tunnel sides are riveted to the floor panels. We did this with the structure on its side. Easy riveting for a change. The tunnel sides need to be riveted to muffler sides. The Routing…
All the joints have to be sealed with Proseal which takes a little planning. I used a syringe to put the required 1/16″ bead around the floor panels and the curved parts of the Muffler…
All the joints around the Muffler tunnel have to be sealed with Proseal. Messy old job. The Firewall assembly is then trial mounted to the Muffler and floor panels. MAJOR COCKUP. I had left the…