Workshop complete Posted By: Chris 2nd March 2017 It took a while, having demolished a disused boiler house, built benches, moved solar plumbing, built a new store for all the bikes, installed a compressor and created as much space as is possible. Should be enough room…just.
Be the first to comment on "Workshop complete"