Fuselage 25-02 construction

Riveted the side channels and doublers to the bulkhead bottom channel:

Had to get a Ø3/8 bolt, to temporarily bolt the pairs of F-01405B Bulkhead Bars before double-flush riveting the bars together. The plans suggest using the wing rear spar as a spacer but as I have QB wings this isn’t possible. I managed to get a piece of 0.250 aluminium, drilled a 3/8th hole and used this as a spacer.

Be the first to comment on "Fuselage 25-02 construction"

Leave a comment

Your email address will not be published.


*


This site uses Akismet to reduce spam. Learn how your comment data is processed.